Notes for various cycling runs

Spack-stack (SS) version comparisons

  1. To compare SS 1.8.0 with SS 1.6.0 click the Graphs vs Previous for the 2025-04-14 entry. 2025-04-14 run uses SS 1.8.0, 2025-04-13 uses SS 1.6.0
  2. To compare SS 1.9.1 with SS 1.6.0 click the Graphs vs Previous for the 2025-03-30 entry. 2025-03-30 run uses SS 1.6.0, 2025-03-28 uses SS 1.9.1
  3. To compare SS 1.9.3 with SS 1.8.0 click the Graphs vs Previous for the 2025-10-29 entry. 2025-10-26 run uses SS 1.8.0, 2025-10-29 uses SS 1.9.3

Derecho OS upgrade to SLES 15-SP6

  1. Derecho's OS was upgraded on Nov 4-5 2025
  2. New runtime libraries cause deviations in results
  3. 2025-11-12 entry compares 11/12 mpas-bundle code built on upgraded Derecho with 11/02 mpas-bundle code built on pre-upgraded Derecho.
  4. 2025-11-02-sp6 entry compares 11/12 mpas-bundle code built on upgraded Derecho with 11/02 mpas-bundle code built on upgraded Derecho.

Various deviations

  1. 2025-12-04 entry compares a week long simulation using IAU
  2. 2025-06-29-old entry compares the 6/29 code built with the 6/22 version of crtm with the 6/22 run
  3. 2025-06-29 entry compares with the weekly 2025-06-22 run
  4. 2025-03-11 entry compares the weekly 2025-03-09 run with an mpas-bundle 3.0.2 build using crtm bug fix PR 209
  5. 2025-03-07 entry compares the weekly 2025-02-16 run with an mpas-bundle 3.0.2 build using crtm 2.4.1
  6. 2025-03-09 entry compares to the weekly 2025-02-16 run. The results are the same.
  7. 2025-01-06 run compares MPAS-Model using SMIOL to the weekly 2025-01-05 run with MPAS-Model using PIO. The results are the same.
  8. 2025-01-05 entry compares to the weekly 2024-12-31 run. The results diverged.
  9. 2025-mpas8-2-2 entry compares a new mpas bundle with MPAS-Model 8.2.2 to the weekly 2024-12-31 run. The results diverged.

GPU runs

  1. 2025-05-30 entry compares the GPU run of 2025-05-30 with the cpu run of 2025-05-29. The results diverge.
  2. 2025-05-31 entry compares the GPU run of 2025-05-31 with the GPU run of 2025-05-30.
  3. 2025-06-01 entry compares the cpu run of 2025-06-01 with the GPU run of 2025-05-31. The results diverge.
  4. 2025-06-15 entry compares the cpu run of 2025-06-15 with the GPU run of 2025-06-01. The results diverge.